top of page

Fri, May 20

|

Los Angeles

Hyperion Water Reclamation Plant Tour - Behind the scenes with ASCE President Elect, Maria Lehman

Join ASCE President Elect Maria Lehman as we explore Los Angeles' oldest and largest waste water treatment plant. These facilities have been upgraded with state of the art technologies that allow it to take resource recovery to new heights, including water re-use, nutrient capture, and power.

Registration is closed
See other events
Hyperion Water Reclamation Plant Tour - Behind the scenes with ASCE President Elect, Maria Lehman
Hyperion Water Reclamation Plant Tour - Behind the scenes with ASCE President Elect, Maria Lehman

Time & Location

May 20, 2022, 1:30 PM – 4:00 PM

Los Angeles, 12000 Vista Del Mar, Playa Del Rey, CA 90293, USA

About the Event

Join ASCE President Elect Maria Lehman as we explore Los Angeles' oldest and largest waste water treatment plant. These facilities have been upgraded with state of the art technologies that allow it to take resource recovery to new heights, including water re-use, nutrient capture, and power.

Share This Event

bottom of page